Project: Earls Court – TID (Train Indicator Display) Installation Works
Client: LUL Nominee SSL
Value: £75,000
This project was for the installation of four new Train Indicator Displays at for the platforms at Earls Court London
Underground Station.
Thorntask were contracted by LUL Nominee SSL to carry out the following;
- Identify cable routes
- Survey and Identify local Switchroom
- Install Fibre Optic Data Terminal Point
- Installation of a cabinet with the hardware for fibre termination located within
- Supply and install Fibre Optic Data Cables
- Supply and install Steel Wired Armoured (SWA) electrical cables