Project: Bethnal Green – Acoustic
Panel Works
Client: LUL Nominee BCV
Value: £100,000
Following surveys at Bethnal Green Station it was identified that the existing insulation in the cladding panels on the
platforms was non-compliant with London Underground specification. As such Thorntask were contracted by LUL
Nominee BCV to carry out the removal of the non-compliant cladding.
The Scope of Works consisted of;
- Careful removal of existing cladding panels.
- Removal of existing acoustic insulation including removal of any adhesives and riveted connections.
- Check existing support structure to ensure structural stability, carry out any remedial works which may be
required